Modernisation, mechanisation and industrialisation of concrete structures / (Record no. 68882)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 05177cam a2200673Ki 4500 |
001 - CONTROL NUMBER | |
control field | ocn973222848 |
005 - DATE AND TIME OF LATEST TRANSACTION | |
control field | 20220711203420.0 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 170220s2017 enk ob 001 0 eng d |
020 ## - INTERNATIONAL STANDARD BOOK NUMBER | |
ISBN | 9781118876541 |
-- | (electronic bk.) |
020 ## - INTERNATIONAL STANDARD BOOK NUMBER | |
ISBN | 1118876547 |
-- | (electronic bk.) |
020 ## - INTERNATIONAL STANDARD BOOK NUMBER | |
ISBN | 9781118876503 |
-- | (electronic bk.) |
020 ## - INTERNATIONAL STANDARD BOOK NUMBER | |
ISBN | 1118876504 |
-- | (electronic bk.) |
029 1# - (OCLC) | |
OCLC library identifier | AU@ |
System control number | 000059781734 |
029 1# - (OCLC) | |
OCLC library identifier | DEBSZ |
System control number | 485198592 |
029 1# - (OCLC) | |
OCLC library identifier | CHVBK |
System control number | 483027898 |
029 1# - (OCLC) | |
OCLC library identifier | CHNEW |
System control number | 000948315 |
029 1# - (OCLC) | |
OCLC library identifier | GBVCP |
System control number | 898142911 |
029 1# - (OCLC) | |
OCLC library identifier | CHVBK |
System control number | 502850809 |
029 1# - (OCLC) | |
OCLC library identifier | CHBIS |
System control number | 011081560 |
029 1# - (OCLC) | |
OCLC library identifier | CHVBK |
System control number | 503327360 |
029 1# - (OCLC) | |
OCLC library identifier | CHSLU |
System control number | 001301053 |
082 04 - CLASSIFICATION NUMBER | |
Call Number | 338.4/76241834 |
245 00 - TITLE STATEMENT | |
Title | Modernisation, mechanisation and industrialisation of concrete structures / |
300 ## - PHYSICAL DESCRIPTION | |
Number of Pages | 1 online resource. |
505 0# - FORMATTED CONTENTS NOTE | |
Remark 2 | Cover; Title Page; Copyright; Contents; About the Editors; Notes on Contributors; Preface; Part I Modernisation of Precast Concrete Structures; Chapter 1 Historical and Chronological Development of Precast Concrete Structures; 1.1 The five periods of development and optimisation; 1.2 Developing years and the standardisation period; 1.3 Optimisation and the lightweight period; 1.4 The thermal mass period; References; Chapter 2 Industrial Building Systems (IBS) Project Implementation; 2.1 Introduction; 2.2 Routes to IBS procurement |
505 8# - FORMATTED CONTENTS NOTE | |
Remark 2 | 2.3 Precast concrete IBS solution to seven-storey skeletal frame2.4 Manufacture of precast concrete components and ancillaries; 2.5 Minimum project sizes and component efficiency for IBS; 2.6 Design implications in construction matters; 2.7 Conclusions; References; Chapter 3 Best Practice and Lessons Learned in IBS Design, Detailing and Construction; 3.1 Increasing off-site fabrication; 3.2 Standardisation; 3.3 Self-compacting concrete for precast components; 3.4 Recycled precast concrete; 3.5 Building services; 3.6 Conclusions; References |
505 8# - FORMATTED CONTENTS NOTE | |
Remark 2 | Chapter 4 Research and Development Towards the Optimisation of Precast Concrete Structures4.1 The research effort on precast concrete framed structures; 4.2 Precast frame connections; 4.3 Studies on structural integrity of precast frames and connections; References; Part II Mechanisation and Automation of the Production of Concrete Elements; Chapter 5 Building Information Modelling (BIM) and Software for the Design and Detailing of Precast Structures; 5.1 Building information modelling (BIM); 5.2 Technologies; 5.3 BIM in precast construction; 5.4 Summary; References |
505 8# - FORMATTED CONTENTS NOTE | |
Remark 2 | Chapter 6 Mechanisation and Automation in Concrete Production6.1 Development of industrialization and automation in the concrete prefabrication industry; 6.2 CAD-CAM BIM from Industry 2.0 to 4.0; 6.3 Automation methods; 6.4 Integrated and automated prefabricated production process; 6.5 Limits of automation; 6.6 Summary and outlook; Part III Industrialisation of Concrete Structures; Chapter 7 Lean Construction -- Industrialisation of On-site Production Processes; 7.1 Work process planning (WPP); 7.2 Construction production process planning procedure |
505 8# - FORMATTED CONTENTS NOTE | |
Remark 2 | 7.3 Work process planning (WPP) -- work execution estimation7.4 Work process planning (WPP) -- planning the processes and construction methods; 7.5 Planning the execution process; 7.6 Procedure for selecting construction methods and processes; 7.7 Conclusions to Chapter 7; References; Chapter 8 Lean Construction -- Industrialisation of On-site Production Processes; 8.1 Introduction -- top-down / bottom-up work planning scheduling and resource planning; 8.2 Scheduling and resource planning; 8.3 Site Logistics; 8.4 Weekly work plans; 8.5 Construction site controlling process |
505 8# - FORMATTED CONTENTS NOTE | |
Remark 2 | 8.6 CIP -- the continuous improvement process |
700 1# - AUTHOR 2 | |
Author 2 | Elliott, Kim S., |
700 1# - AUTHOR 2 | |
Author 2 | Hamid, Zuhairi Abd., |
856 40 - ELECTRONIC LOCATION AND ACCESS | |
Uniform Resource Identifier | https://doi.org/10.1002/9781118876503 |
942 ## - ADDED ENTRY ELEMENTS (KOHA) | |
Koha item type | eBooks |
264 #1 - | |
-- | Chichester, UK ; |
-- | Hoboken, NJ : |
-- | John Wiley & Sons, |
-- | 2017. |
336 ## - | |
-- | text |
-- | txt |
-- | rdacontent |
337 ## - | |
-- | computer |
-- | c |
-- | rdamedia |
338 ## - | |
-- | online resource |
-- | cr |
-- | rdacarrier |
588 0# - | |
-- | Print version record. |
650 #0 - SUBJECT ADDED ENTRY--SUBJECT 1 | |
-- | Concrete construction industry. |
650 #7 - SUBJECT ADDED ENTRY--SUBJECT 1 | |
-- | Concrete construction industry. |
-- | (OCoLC)fst00874304 |
650 #7 - SUBJECT ADDED ENTRY--SUBJECT 1 | |
-- | BUSINESS & ECONOMICS / Industries / General |
994 ## - | |
-- | 92 |
-- | DG1 |
No items available.